Fenland supplied and installed two different systems on this project.
The installation of Sarnafil to the gutters on the step backs of levels 29 to 35 and additionally levels 35 to 42 of the main building.
As well as the above, they supplied and installed hot melt on the pavilion roof to levels 4 and 5, BMU garage on level 42 and on the wind turbine level, 43.